| TimTie | Installation | ||||||||||||
New build
cavity wall tie for timber
|
|
Benefits
|
Tie length/cavity width
![]() |
|
Load
tie into hand held support tool |
![]() |
|
Position
as required as outer leaf masonry is constructed |
|
| Hammer into timber stud, through insulation when fitted, and fit retaining clip |
![]() |
| Outer end of tie fully embedded in masonry leaf mortar |
|
Classification
of TimTie using DD140 |
![]() |