Remedial
wall tie for use with thin wall far leaves and in buildings over
four storeys high.
Applications
Where far leaf is a thin wall hollow block unable to provide a sufficient
depth of grip, CemenTie uses a grout filled sock sleeve to provide
a secure bond: grouted in both leaves, particularly from the fourth
floor upwards to comply with fire regulations.
Features
-
one-piece
grade 304 or 316 stainless steel tie
-
rotational
flexibility accommodates normal building movement
-
able
to bond with thin wall far leaf
-
easily
proof tested for security of fixing in far leaf
-
effective
in all common building materials
-
tie,
sock sleeve and grout create excellent bond
|
Benefits
-
highly
economical and effective
-
leaves
building virtually unmarked
-
minimal
inconvenience to occupants
-
multiple
drip points prevent transfer of water across cavity
-
comprehensively
tested and proven
|
Bonding Agent
HeliBond cementitious grout
|
|
 |
|
Drill
12mm clearance hole in both leaves
and flush clean. |
|
 |
|
Place
sock sleeve over end of grout gun
nozzle and insert into hole in far leaf. |
|
 |
|
Inject
sufficient grout to fill sock and
expand it behind far leaf. |
|
 |
|
Insert
CemenTie, with plastic sleeve
fitted, into fabric sock. |
|
 |
|
When
cured, test security of far leaf fixing,
as required. |
|
 |
|
Inject
grout to fill hole in near leaf and
make good. |
|